Bridging loans are priced case by case. Lenders consider the property, loan-to-value ratio, borrower, purpose, term, exit strategy and complexity before setting the rate and fees. Understanding the complete cost helps prevent a superficially cheap offer from becoming an expensive surprise.

Quick answer

Bridging interest is usually quoted as a monthly percentage. Through UK Property Finance, rates start from 0.55% per month. The actual cost can also include arrangement, valuation, legal, broker, transfer and administration fees. Compare the total amount repayable and net cash released.

How bridging loan interest is calculated

A simple illustration multiplies the loan by the monthly rate and the number of months. For example, £250,000 at 0.75% per month produces £1,875 of interest per month before fees. If it ran for nine months on a simple basis, the illustrative interest would be £16,875.

Real lender calculations may differ because interest can be charged on the gross facility, include retained interest, be calculated daily, have a minimum period or change after default or expiry. Always rely on the lender’s formal illustration and legal documents.

Monthly rate versus annual equivalent

Multiplying a monthly rate by 12 gives a simple annualised figure, but it may not reflect compounding, fees or the actual term. APRC may be shown for regulated lending under the applicable rules, but total pounds repayable is often the clearest comparison for a specific short-term plan.

Serviced, rolled-up and retained interest

Interest optionCash-flow effectCost consideration
ServicedPaid monthly from income or other resourcesPrevents interest accumulating, but affordability must be evidenced
Rolled upNo contractual monthly interest payment; accrued interest is repaid on exitThe redemption balance grows with time
RetainedAn allowance is deducted or incorporated at completionThe usable net advance can be lower than the gross facility

Common bridging loan fees

Lender arrangement fee

Usually calculated as a percentage of the loan or facility. Check whether it is paid separately, deducted from the advance or added to the balance.

Valuation fee

The lender normally requires an independent valuation. Cost varies with property value, type, location, complexity and whether additional figures—such as value after refurbishment—are required.

Legal fees

The borrower normally pays their own solicitor and the lender’s legal costs. Complex title, leases, multiple securities, companies and short deadlines can increase the work.

Broker fee

A broker may charge a fee for arranging the facility. The amount and payment timing should be disclosed before the borrower commits.

Administration, transfer and exit charges

Some lenders charge telegraphic transfer, asset-management, redemption or exit fees. Check the tariff, including what happens if the loan is repaid early, extended or allowed to expire.

How LTV affects the rate

Lower LTV generally provides the lender with a larger equity margin and may improve pricing, although it does not guarantee approval. The relevant value can also differ: a lender may use purchase price, current market value, a restricted sale value or another figure under its policy.

Where there is an existing mortgage, the lender considers combined secured borrowing. A second-charge bridge can therefore have a higher combined LTV than the new advance alone suggests.

Gross loan, net loan and net advance

Suppose the borrower needs £250,000 in usable funds. If retained interest and fees are deducted, a £250,000 gross facility may not provide £250,000 at completion. Conversely, the lender may structure a larger gross facility so the required net amount is released.

Ask every lender or broker to state the gross facility, all deductions, the net advance on completion, the interest basis and estimated redemption amount on the same assumed date.

What affects the final price?

  • Loan-to-value and available equity.
  • Residential, commercial, mixed-use or land security.
  • First or second legal charge.
  • Property condition and refurbishment scope.
  • Strength and evidence of the exit strategy.
  • Borrower experience, credit profile and structure.
  • Required speed and legal complexity.
  • Whether the case is regulated.
Cost can rise if the exit slips. A longer-than-planned term may add interest, extension charges or default pricing. Use realistic assumptions and discuss delays before the contractual end date.

How to compare bridging quotes

  1. Use the same net funding requirement and target completion date.
  2. Check which property value and LTV each lender uses.
  3. Compare the net cash released after deductions.
  4. List every lender, valuation, legal, broker and exit fee.
  5. Calculate redemption on the same realistic exit date.
  6. Review minimum interest and early-repayment terms.
  7. Compare service and deliverability as well as cost.

Our bridging loan calculator provides an initial illustration. It is not an offer and cannot reflect all lender calculations.

Frequently asked questions

What interest rate do bridging loans charge?

Rates vary. Through UK Property Finance, indicative rates start from 0.55% per month, subject to borrower, property, LTV, purpose, exit and lender approval.

What fees apply?

Potential costs include arrangement, valuation, legal, broker, transfer, administration and sometimes exit fees.

Is the lowest rate always the cheapest option?

No. The net advance, fees, interest method, minimum term and expected exit date can materially change total cost.

Sources and tools